Electrical safety
EICR Remedial Work
Put right C1, C2 and FI observations after a failed EICR. Remedial work to turn an unsatisfactory EICR into a satisfactory one.
- How often
- As required
- Valid for
- Until next EICR
- Time on site
- Depends on the work
- Standard
- BS 7671 (18th Edition)
About the service
Failed your EICR?
If issues are found, they're classified as C1 (danger present), C2 (potentially dangerous), or C3 (improvement recommended). C1 and C2 issues must be fixed before we can issue a satisfactory certificate. We provide detailed reports and can arrange remedial work.
Send us your report and our NICEIC registered electricians will review every observation, quote for the work and complete it so your installation can be certified as satisfactory.
What's included
- Work to clear C1, C2 and FI observations
- Consumer unit upgrades and RCD protection
- Earthing and bonding corrections
- Smoke and heat alarms where required
- Written completion confirmation

Remedial work deadlines
Landlords and homeowners whose EICR has come back unsatisfactory, or who have FI items that need further investigation.
- 1Where an EICR is unsatisfactory, landlords must complete remedial work or further investigation within 28 days, or a shorter period if the report specifies one.
- 2Written confirmation that the work is done must be supplied to the tenant and the local authority within 28 days of completion.
- 3Local authorities can arrange the work themselves and recover the cost if a landlord fails to act.
How it works
Our Remedial Process
From unsatisfactory report to compliant installation
- 01
Upload Your Report
Send us the failed EICR with your name and number.
- 02
Review & Quote
We check every C1, C2 and FI observation and send a clear quotation.
- 03
Remedial Work
Our electricians complete the work, including consumer units and RCD protection where required.
- 04
Confirmation
Written confirmation of completion for you and your local authority.
Book online
Request your EICR Remedial Work
Tell us about the property and the work needed. We will review it and send you a fixed price quote.
- Secure
- Fast Response
- Certified
- No Obligation
Step 1 / 4
Where is the property?
The address our engineer will visit, and how to reach you.

Why Landlord Safety
Why landlords choose us
Stress-free compliance from certified engineers. Clear reports, on-time visits and certificates issued within 24 hours of inspection.
- NICEIC approved
- NAPIT registered
- BS 7671 (18th Edition)
- Fully insured

Save a visit
EICR Remedial Work + EICR Certificate
Many landlords book these together. EICR certificates by qualified electricians for landlord compliance. Combine both in one booking and our engineers can cover them in a single visit where possible.
Also popular: Fire Alarm Certificate · Emergency Lighting Certificate
Accredited & certified
Our accreditations
Every engineer is registered with the UK’s leading safety and quality schemes.
- Gas Safe Register
- NAPIT
- MCS Certified
- Quality Mark Protection Accredited
- HIES Consumer Code
- Installation Assurance Authority
FAQ
EICR Remedial Work questions
If issues are found, they're classified as C1 (danger present), C2 (potentially dangerous), or C3 (improvement recommended). C1 and C2 issues must be fixed before we can issue a satisfactory certificate. We provide detailed reports and can arrange remedial work.
Landlords must complete remedial work within 28 days of the inspection, or sooner if the report states a shorter period.
Remedial work is quoted individually after we review your report, because it depends on the observations listed.

Submit Your Failed EICR
Upload your report and we'll reply with a quotation for the remedial work.