Skip to content
landlordsafetyCompliance Certificates

Regulations

EICR Rules for Landlords: What the Law Requires

The Electrical Safety Standards Regulations explained: how often landlords need an EICR, who gets a copy, the 28-day remedial deadline and fines up to £30,000.

Landlord Safety Team··5 min read

Since 2020, landlords in England have had a legal duty to have the electrical installation in their rented properties inspected and tested by a qualified person. This guide explains what the Electrical Safety Standards Regulations require, the deadlines that apply and what happens if a report comes back unsatisfactory.

The law in brief

The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 apply to new tenancies from 1 July 2020 and to existing tenancies from 1 April 2021. Government guidance updated in November 2025 now covers both the private and social rented sectors.

  • The fixed electrical installation must be inspected and tested at least every 5 years
  • If the report sets an earlier date for the next inspection, that earlier date applies
  • The inspection must be carried out by a qualified and competent person
  • Testing is carried out against BS 7671, the IET Wiring Regulations

Who must receive a copy of the report

  • Existing tenants: within 28 days of the inspection
  • New tenants: before they move in
  • Prospective tenants: within 28 days of a written request
  • The local authority: within 7 days of a written request
  • The next inspector: keep a copy to hand over at the next inspection

Do I need a new EICR for every new tenancy?

No. If the current report is still within date and does not require further work, you do not need a fresh inspection before re-letting. You must still give the new tenant a copy of the latest report. Government guidance recommends at least a visual check of the property between tenancies.

Understanding the observation codes

  • C1 (Danger present): risk of injury, immediate remedial action required
  • C2 (Potentially dangerous): urgent remedial action required
  • FI (Further investigation required without delay)
  • C3 (Improvement recommended): advisory only, does not make the report unsatisfactory

Any C1, C2 or FI code makes the report unsatisfactory. The landlord must then complete the remedial work or further investigation within 28 days, or within any shorter period stated in the report, and give written confirmation that the work is done to the tenant and the local authority within 28 days of completion.

What about commercial properties?

The rented-sector regulations apply to residential lettings. For commercial premises there is no single fixed legal interval, but employers and building owners must keep electrical systems safe under the Electricity at Work Regulations 1989. The IET's Guidance Note 3 recommends maximum intervals between inspections, for example 5 years for offices and shops and 3 years for industrial premises, with shorter intervals for higher-risk installations.

How to stay compliant

  1. Check the next inspection date on each property's current report
  2. Book the inspection with a registered electrician (for example NICEIC or NAPIT)
  3. Send copies to tenants within the deadlines above
  4. Complete any C1, C2 or FI work within 28 days and confirm it in writing
  5. Keep every report and remedial certificate on file

Is your EICR due?

Our NICEIC and NAPIT registered electricians inspect and test to BS 7671 and issue your report within 24 hours of the visit.

Book EICR Inspection